Lizardos recently completed commissioning of the new boiler plant at the Hospital, a project that a different project team at Lizardos had designed and administered construction. 

Equipment commissioned included:

  • High Pressure Steam Packaged Firetube Boilers (B-1, B-2 and B-3)
  • Deaerator Pumps (BFP-1, 2, 3, and 4)
  • Fuel Oil Pump Skids (FOP-1 and 2)
  • Condensate Return Tank (C-1)

Commissioning services provided included: 

  • Developed and implemented commissioning plan
  • Reviewed approved submittals for equipment to be commissioned
  • Prepared pre-functional commissioning checklists and system verification
    checklists
  • Directed and witnessed system performance testing
  • Witnessed piping pressure tests, and flushing, cleaning and chemical treatment
  • Assisted with Owner’s personnel training
  • Reviewed O & M manuals and as-built drawings
  • Issued final commissioning report

click images for larger view

  • Montefiore-New Rochelle Hospital - Lizardos Engineering Case Study
  • Montefiore-New Rochelle Hospital - Lizardos Engineering Case Study
  • Montefiore-New Rochelle Hospital - Lizardos Engineering Case Study
  • Montefiore-New Rochelle Hospital - Lizardos Engineering Case Study

 

 

Contact

Contact Lizardos

Twitter Facebook

LinkedIn YouTube Google Plus

Careers

Visit our career pages for updated careers

Services

Mechanical
Electrical
Plumbing
Central Utility Plant Design
Site Infrastructure
Sustainability
Building Management
Commissioning
BIM
Industrial
Construction