Initial MEP Infrastructure Assessment and Final Design for 77 Bleecker Street 

New York City, NY

 

Lizardos conducted an initial MEP infrastructure assessment of the building to:

  • Review current operational problems in the building (including the condenser water system) to determine cause and remedy for each problem.
  • Review MEP building systems to identify systems and equipment approaching the end of expected service life, and to make recommendations for replacement before unexpected failure threatens normal building operation.
  • For each recommendation describe required action, associated capital cost, impact on building operation during implementation, and associated benefits.
  • Also describe any risk associated with not implementing each recommendation.
  • Prioritize recommendations by urgency, and prepare a phased implementation plan to construct the recommendations.

Based upon findings of the initial assessment, Lizardos then prepared contract drawings and specifications for a design to provide vertical risers, horizontal loops, heat exchangers, pumps, water treatment, controls and power designs for a secondary water loop servicing the water source heat pumps units. The design also included the replacement of a rooftop cooling tower.

click images for larger view

  • Century Management- Lizardos Engineering Case Study
  • Century Management- Lizardos Engineering Case Study
  • Century Management- Lizardos Engineering Case Study
  • Century Management- Lizardos Engineering Case Study


 

Contact

Contact Lizardos

Twitter Facebook

LinkedIn YouTube Google Plus

Careers

Visit our career pages for updated careers

Services

Mechanical
Electrical
Plumbing
Central Utility Plant Design
Site Infrastructure
Sustainability
Building Management
Commissioning
BIM
Industrial
Construction