Brookhaven National Laboratory

Upton, NY


Lizardos designed the MEP systems for the new building to house a 6600 square foot data center.  The data center has space for 136 EIA Racks and an Automated Tape Robot Library and is dedicated to high energy physics research.  Cooling for the computer equipment is provided by 15 Liebert Computer Room Air Conditioning (CRAC) units distributing air into a raised floor plenum.  The CRAC units utilize chilled water from the central chilled water plant.  New piping was designed to support 400 tons of cooling.

 

The electric design included new 2,000 kVA pad-mounted transformer, 480V distribution panels, power distribution centers, lighting, fire alarm, distribution board, 6-way 15 kV switch, empty conduits for future 2,000 kW emergency generator and two future 1.2 megawatt flywheel UPS units.

 

Contact

Contact Lizardos

Twitter Facebook

LinkedIn YouTube Google Plus

Careers

Visit our career pages for updated careers

Services

Mechanical
Electrical
Plumbing
Central Utility Plant Design
Site Infrastructure
Sustainability
Building Management
Commissioning
BIM
Industrial
Construction